The causes of lateral displacement of piled wharfs are analyzed in the light of engineering examples and precautionary measures and recommendations are proposed. 结合工程实例分析了高桩码头横向水平位移的原因,提出了预防措施和建议。
Directed against the actual engineering design, a four-outrigger highrise structure will be used to demonstrate the calculation of the lateral deflection. 以设置四道外伸臂超高层结构为例,探讨了带外伸臂超高层建筑结构的水平位移计算问题。