After an extended period of game testing, AXA has produced the following guide. 在测试的一比赛的延长期之后,安盛生产下列向导。
If it fails to complete the preparatory work within the extended period, the acceptance decision made by the CIRC shall be automatically invalidated. 在延长期内仍未完成筹建工作的,中国保监会作出的受理决定自动失效。